Straight answers on who we are, what we build, the studies we carry out and how to work with us. If your question is not here, email info@egearzone.com.

About eGearZone

What does eGearZone do?

eGearZone is a medium- and low-voltage EPC contractor. We design, build, test and commission substations, containerised switchrooms and E-houses, skid-mounted substations, LV switchboards and transformer and RMU installations, and we carry out ETAP power system studies.

Where is eGearZone based?

Egear Zone Limited is registered in the United Kingdom, with its head office at 1 Park Corner, Northampton NN5 5FL. Engineering, operations and supply-chain work is carried out by our Sri Lanka branch, EGear Zone (Pvt) Ltd, in Colombo 05.

Which countries do you work in?

The United Kingdom, Australia and the Maldives. We have delivered projects in all three.

How long has eGearZone been operating, and how much have you supplied?

eGearZone was founded in 2019 and has supplied more than 50 MVA of power equipment.

What projects have you delivered?

Examples include a 22 kV containerised switchroom for an Australian client, designed and simulated in ETAP, then built, tested and exported to Australian Standards; the LV panel for Lux Maldives (2025); and the full AC side of the Cheval Blanc Randheli floating solar plant for Swimsol. See our projects.

Equipment and delivery

What voltages do you work at?

Our delivered projects include 11 kV and 22 kV substations and switchrooms and 400 V distribution. Send us your system voltage and we will confirm the scope.

What sizes of skid-mounted substation have you built?

Skids built so far include 300 kVA, 1000 kVA and 1200 kVA units. Send us your load and voltages and we will size the transformer and switchgear.

Is equipment tested before it leaves the factory?

Yes. Equipment goes through factory acceptance testing before dispatch, so it arrives tested and ready to connect.

Do you supply equipment for temporary power and rental fleets?

Yes. We build skid-mounted substations, containerised switchrooms, transformers, RMUs and LV boards for rental and temporary-power companies. See temporary power and rental fleets.

Do you supply only, or deliver full EPC?

Both, from supply-only packages to full EPC.

Engineering studies

Do you carry out arc flash studies in the UK?

Yes. We carry out arc flash studies in ETAP to IEEE 1584 and can collect the site data in the UK. Read do I need an arc flash study in the UK?

Which software do you use for studies?

ETAP for power system studies (arc flash, protection co-ordination, fault level and load flow) and PVsyst for solar yield simulation.

Do you apply relay settings or carry out injection testing on site?

No. Our studies are simulation only. The settings we recommend are applied on site by your commissioning or maintenance contractor.

Do you carry out G99 grid connection studies?

No, we do not offer ENA G99 studies.

Working with us

How do I get a quote?

Use the request a quote form, email info@egearzone.com, call +44 7770 055272 (UK) or +94 76 657 0000 (Sri Lanka), or message us on WhatsApp at +44 7341 013484.