ETAP arc flash studies in the UK
Arc flash hazard studies modelled in ETAP to IEEE 1584, with incident energy at every board, arc flash boundaries, PPE guidance and labels — and practical ways to bring the risk down.

Why UK sites commission an arc flash study
UK law does not name the arc flash study as such, but the Electricity at Work Regulations 1989 require electrical systems to be constructed, maintained and worked on so as to prevent danger so far as is reasonably practicable, and the Management of Health and Safety at Work Regulations 1999 require a suitable and sufficient risk assessment. An arc flash study gives duty holders the evidence behind that assessment: how much energy could be released at each point in the system, and what that means for how people work on it. Read our guide: is an arc flash study a legal requirement in the UK?
Working dead remains the default in the UK. The study helps you decide where live work, testing or switching can be justified, what controls are needed, and where design or protection changes would remove the hazard altogether.
What the study covers
- An ETAP model of your MV and LV network built from single-line diagrams, cable schedules and protection settings
- Fault level (short circuit) calculations to IEC 60909 as the basis for the arc flash results
- Incident energy and arc flash boundary at each switchboard, MCC and distribution board, calculated to IEEE 1584
- Assessment of upstream protective device clearing times, including the effect of current settings
- Arc flash warning labels for each assessed location
- Recommendations to reduce incident energy — protection setting changes, maintenance switches, faster clearing or design changes — for your commissioning or maintenance contractor to implement
- Several operating scenarios where relevant, for example grid supply, standby generation and bus-section arrangements
What you receive
Report
A clear report setting out assumptions, data sources, the ETAP model, results by location and recommendations.
Labels
Arc flash labels ready to print and fix at each assessed board.
ETAP model
The ETAP model files on request, so future changes can be re-studied quickly.
How we work
- Data. We start from your single-line diagram, equipment and cable data and existing protection settings. Where records are incomplete or out of date, our engineers can collect the data on site in the UK.
- Model. We build and check the ETAP model, then run fault level and arc flash calculations.
- Review. We walk you through the results and recommendations before issuing the final report.
- Follow-through. Where the study recommends new protection settings, we can carry them through a protection co-ordination study.
Frequently asked questions
Is an arc flash study a legal requirement in the UK?
No UK regulation names the arc flash study specifically. The Electricity at Work Regulations 1989 and the Management of Health and Safety at Work Regulations 1999 require you to prevent danger and assess risk, and an arc flash study is a recognised way to support that assessment where people work on or near energised equipment.
Which standard do you use?
Incident energy is calculated to IEEE 1584 in ETAP, using fault levels calculated to IEC 60909. We explain where IEEE 1584 assumptions fit UK and IEC equipment and where engineering judgement has been applied.
What information do you need from us?
Single-line diagrams, transformer and generator data, cable types and lengths, protective device types and settings, and the DNO fault level at the point of supply. If records are incomplete, we can collect the missing data on site in the UK, or tell you what is missing and how it affects the results.
How often should the study be updated?
Whenever the network changes in a way that affects fault levels or protection — for example a new transformer, generator, supply upgrade or setting change — and as part of a periodic review of your electrical safety arrangements.
Do you work outside the UK?
Yes. We also carry out ETAP studies for projects in the Maldives and Australia, including studies for the containerised switchrooms and substations we build.
Discuss your project with us
Send us your single-line diagram, specification or RFQ and we will reply with a scope and price.