Home › Engineering services › Power system studies › Protection co-ordination studies
Power system studies · UK
Protection co-ordination studies in the UK
ETAP protection co-ordination (grading and discrimination) studies for MV and LV networks — relay and breaker settings that clear faults quickly and only where they occur.

Why protection co-ordination matters
A well-co-ordinated protection system disconnects only the faulted part of the network, as fast as possible, and leaves the rest running. Poor grading leads to nuisance tripping, unnecessary loss of supply and longer fault clearing times — which in turn raise equipment damage and arc flash energy.
A co-ordination study is normally needed for a new installation, after network changes such as a new transformer, generator or supply upgrade, and when a review shows that existing settings no longer match the system.
What the study covers
- An ETAP model of the network from the DNO point of supply down to the main LV distribution
- Maximum and minimum fault level calculations (IEC 60909) for each operating scenario
- Time-current grading of relays, fuses, ACBs and MCCBs, checking discrimination margins between devices
- Overcurrent and earth fault settings, including instantaneous and definite-time elements where used
- Checks against equipment withstand ratings, cable thermal limits and transformer damage curves
- Review of interface with the DNO, including settings required for generation connections under ENA Engineering Recommendation G99 where applicable
- Recommended relay and trip unit settings, ready for your commissioning engineer to apply on site
What you receive
Settings schedule
A relay and breaker settings schedule for every device studied, ready for commissioning engineers.
Grading curves
Time-current curves for each protection path, showing discrimination margins.
Report
Assumptions, fault levels, findings and prioritised recommendations.
Linked studies
Protection settings directly drive arc flash results, so we often run the two together. See our arc flash studies, or the full range of power system studies, including short circuit, load flow, earthing and cable sizing.
Frequently asked questions
What is the difference between protection co-ordination, grading and discrimination?
They describe the same goal. Grading is setting devices so that the one nearest the fault operates first; discrimination (or selectivity) is the result — only the faulted circuit is disconnected. The co-ordination study checks and sets both.
Can you apply the settings on site?
No. We are a studies and simulation team: we deliver the settings schedule and grading curves, and your commissioning or maintenance contractor applies and tests the settings on site. We are happy to answer their questions during commissioning.
Do you include generators and battery storage?
Yes. Standby generators, solar and battery systems change fault levels and protection behaviour, so we model each operating mode. For generation connected in parallel with the public network, we take account of the DNO and G99 interface protection requirements.
What information do you need?
Single-line diagrams, DNO fault level data, transformer and generator data, cable details and the make, model and present settings of each protective device. If these records are incomplete, our engineers can collect the data on site in the UK.
Which software do you use?
ETAP for power system and protection studies, with the model available to you on request. For solar PV projects we also use PVsyst for energy yield simulation.
Discuss your project with us
Send us your single-line diagram, specification or RFQ and we will reply with a scope and price.